Aantrik Interior Design Studio Terms and Conditions
This quotation is valid for 30 days, subject to changes in the prices of materials. Prices may vary when booked beyond this date.
If the project does not enter production within 90 days after booking, the quoted prices may vary as per the current rate card.
The quoted rates are estimates based on current designs and sizes. They are liable to change until the sign-off/production stage, depending on actual measurements on-site or any design/material changes made by you or as per your instructions.
We promise to complete your project within 90 to 120 working days of receiving 60% of the quote value to start production, depending on the scale of the project. The project timeline will be affected by the non-receipt of respective payments, pending decisions, and additional line items/works.
Any kind of civil works, painting, plumbing, core cutting, gas piping, and electrical works are at an additional cost and with advance payment. The exact value of the quote will depend on the site conditions.
For booking an order with Aantrik, Customer quote value should include a minimum of INR 15,00,000 + tax of "woodwork".
The design phase for a project will not extend beyond 60 days, which includes three design iterations.
Design and drawings are the sole property of Aantrik and will not be shared with any third party.
If products are ready in the factory and for any reason attributable to the customer, we cannot dispatch them to the site, Aantrik will charge load holding charges of INR 1000/day until the dispatch of products to the site.
For any procurement done by Aantrik on behalf of the client (such as hob, chimney, geysers, ACs, tiles, sink, and faucet), there will be an additional service charge of 20% by Aantrik on the original product price.
Customer Responsibilities
Electricity connection shall be provided by the customer.
Approvals and permission form the builder.
Any deposits to commence the works at site will be made by the owner.
Third-Party Vendors
No third-party vendor or contractor should be present or working at the site when the Aantrik team is working.
All services including electrical, kitchen plumbing, kitchen quartz, kitchen tiles, false ceiling, curtains and painting, etc. should only be executed by Aantrik-approved vendors to ensure quality and on-time delivery.
Installation Check / Handover of Site
The final coat of paint should be done after completion of interior work. Any civil work, electrical work, or woodwork installation done on-site may result in unavoidable hand marks and scratches.
Handover of the site is mandatory before any third-party vendor enters the site and should be done within 10 days after project completion.
Post installation, the following set of services will be done at the site: Dusting, sweeping and mopping of all areas, Cleaning the insides of wooden cabinets.
Deep cleaning with the use of mechanical equipment is out of scope.
Cancellation Policy
Any non-manufacturing defects and damages post-receipt of delivery are not valid for returns or replacements. Customized and made-to-order furniture purchased from Aantrik cannot be returned or exchanged.
All payments made at each stage are non-refundable.
Payment Terms for Woodworks
5% or Rs.1,00,000 (whichever is higher) - Booking amount to confirm your order and start the design process (non-refundable).
60% - Final design sign-off and start production (non-refundable).
35% - Before materials are shipped to the site (non-refundable).
Payment Terms for Services
100% - Service payment to start service work at site.